Cost saving calculation by the work orders generated by Condition Monitoring | |
A: Cost If any damage occures without warning: (If OCM doesnot predict) | Downtime * Cost of Downtime/hr + Direct maintenance cost (unplanned & Unscheduled) + Potential damages |
B: Actual cost of repair: (If OCM predict) | Downtime (if any - should be fixed in scheduled shutdown) * Cost of Downtime/hr + direct maintenance cost (planned & scheduled) + Damages(= 0) |
A- B | Cost of avoidance (Cost Saving) |
Example: | |
If a coupling damage occurs without any prediction. The cost saving (cost of avoidance) can be calculated as mentioned below. | |
A: Cost If any damage occures without warning: (If OCM doesnot predict) | Downtime * Cost of Downtime/hr + Direct maintenance cost (unplanned & Unscheduled) + Potential damages |
Downtime* cost of downtime/hr= 8 hours (say) * 0 (As standby machine is available)=0 USD | |
Direct Maintenance cost ( cost of the coupling and labour hours (say 4 hrs) for replacing the coupling) =3000USD | |
Potential Damages= Cost of damaged bearings and the seals replaced during this opportunity and the extra labour cost (4hrs)= 4000USD | |
(associated damages since it is not predicted at an earlier stage) | |
Total Cost (A)= 0+3000+4000= 7000 USD | |
B: Actual cost of repair: (If OCM predict) | Downtime (if any - should be fixed in scheduled shutdown) * Cost of Downtime/hr + direct maintenance cost (planned & scheduled) + Damages(= 0) |
Downtime* cost of downtime/hr= 4 hours (say since only coupling is damaged) * 0 (As standby machine is available)=0 USD | |
Direct Maintenance cost (material cost and labour hours (say 4 hrs) for replacing the coupling only) =3000 USD | |
Damages= (No other damage occur since coupling damage is predicted before any further failure of other components)= 0 USD | |
Total Cost (B)= 0+3000+0= 3000 USD | |
Cost of avoidance (Cost Saving)= A-B= 7000-3000= 4000 USD |
You can post your technical queries, share your knowledge and industry best practices, discuss the plant/equipment chronic issues in this blog. This is a complete platform for discussion on any Reliability and Maintenance issues
Translate
Cost saving calculation by Condition Monitoring Program
Subscribe to:
Post Comments (Atom)
Popular Posts
-
Cost saving calculation by the work orders generated by Condition Monitoring A: Cost If any damage occures without war...
-
Vibration Severity Chart- 10816 Pdf https://drive.google.com/drive/u/0/my-drive
-
What Is Proactive Maintenance? Proactive maintenance focuses on anticipating and managing machine failures before they occur. Proactive...
No comments:
Post a Comment